Shenzhen Diwei Communication Technology Co., Ltd.

Best price, Best quality GPS Trackers !

Sales & Support
Request A Quote
Select Language

Home 4G GPS Tracker TK418 CAT-M1/NB-IOT GPS asset tracking device with Bluetooth low energy

Sidebar

TK418 CAT-M1/NB-IOT GPS asset tracking device with Bluetooth low energy

Larger Image : TK418 CAT-M1/NB-IOT GPS asset tracking device with Bluetooth low energy

Product Details:

Place of Origin:Guangdong, China (Mainland)
Brand Name:Diwei
CE,FCC:CE,FCC

Payment & Shipping Terms:

Minimum Order Quantity:100 Piece/Pieces
Packaging Details:Package box demensions:130*90*60(mm) Net weight:142g Gross weight:250g
Delivery Time:1-2weeks
Payment Terms:T/T
Supply Ability:30,000 Piece/Pieces per Month
Detailed Product Description

TK418 with Bluetooth is A comprehensive IoT solution to optimize delivery in retail using GPS and BLE equipment. TK418 CAT-M1/NB-IOT GPS asset tracking device with Bluetooth Low Energy (BLE) is a variant of the Bluetooth technology used in many wireless consumer electronics designed for short-range communication, ideal for managing assets of all shapes, sizes, and values.

TK418 GPS tracking devices IoT sensors also serve as Bluetooth Gateways, enabling local communication with other tagged assets and mobile devices for affordable and efficient asset management and sensor monitoring applications.

 

 

HOW IT WORKS

Our TK418 IOT Asset GPS device with BLE contains Bluetooth beacon BT01 and Bluetooth Gateway. It features Bluetooth 5.0 and GPS that are concealed onsite or wired or mounted into high-value assets to track the location and find the Bluetooth signals nearby. Then the third-party Beacon or our Bluetooth beacon is placed on any of the lower-valued assets such as tools, stocks or pallets.

Our TK418 IOT Asset GPS device with BLE performs the tracking and provides an informative report based on the Beacon and sends it to the GPS tracking platform you have used for monitoring.

What is new with TK418

1.Relay For remotely cut engine,

2.Temperature sensor used for monitoring temperature,

3.SOS button used for help,

4.External battery used for power supplier (18650 LI-ion Battery x 2 4800mAh)

5.Notes : (Temperature sensor, SOS button, External battery can be only choose one of the three)

TK418/TK419 Function choose one of the 6 hardware

1.Power cable Positive and negative PIN1 PIN2

2.ACC PIN3 

3.Relay PIN4 

4.For Bluetooth (Hardware Customization) Pin5 PIN6 PIN7 PIN8: 

5.Bluetooth uses:
(1)Bluetooth host, can connect with BLE Beacon
(2)Driver authentication by smart phone
(3)Note: BLE component occupies 4 ports, Pin5/PIN6/PIN7/PIN8 

6.Serial or GPIO(Default) use PIN5 PIN6

7.SOS (Default), Battery, GPIO, iButton use PIN7 PIN8”

 

Cut Engine/Restore

Cut off oil circuits

Server (GPRS/LTE) or Manager Number (SMS) can send cut-fuel-circuit commands to device when needed. Engine can’t start, vehicle will be locked. To make sure safety of vehicle, fuel of vehicle can be cut off only if device has been positioned by GPS and speed of vehicle is less than 20KM/h or vehicle is static.

Recover oil circuits

Server (GPRS/LTE) or Manager Number (SMS) can send recover-fuel-circuit commands to device when needed, device will recover fuel circuits of vehicle.

Shenzhen Diwei Communication Technology Co., Ltd.

Tel:0086-13631518992

Fax:0086-13631518992

Contact Person: Ms. Ada Ke


Send your inquiry directly to us

(0 / 3000)
Copyright © 2011 - 2026 Diwei Track. All rights reserved.
English
French
German
Italian
Russian
Spanish
Portuguese
Dutch
Greek
Japanese
Korean